customer feedback on hydraulic rock drills and splitters

Integrated Drill and Splitting Machine Shipped to Bulgaria

customer feedback on hydraulic rock drills and splitters
customer feedback on hydraulic rock drills and splitters
excavator mounted rock drill splitter working
excavator mounted rock drill splitter working

Project Overview: YG Excavator Drill and Splitting Machine Deployed in Bulgaria

Bulgaria’s infrastructure sector is expanding rapidly, with major investments in road networks, tunnel construction, and mining operations across the country. A Bulgarian civil engineering contractor secured a rock excavation project in the Stara Planina mountain region, requiring efficient rock breaking without traditional blasting methods.

The contractor selected our integrated drill and splitting machine – a hydraulic rock drill and splitter mounted on a 25-ton excavator. This machine arrived on-site in Q1 2026 and has been operating continuously for over 6 months.

View Full Project Details

Technical Specifications of the Integrated Drill and Splitting Machine

The following parameters define the hydraulic rock drill and splitter delivered to the Bulgarian project:

Rock Drilling Machine
PowerDrilling hole diameterDrilling depthDrilling speed
24kwMiddle 120mm1600mm1m/min
Splitting Machine
Splitting depthSplitting forceRotation angle
1000MM8000T120°
Push Beam
Rock drilling maximum propulsionSplitting maximum pullout force
25KN70KN
Excavator requirements:>20T

This integrated drill and splitting machine combines drilling and splitting into a single attachment. The machine first drills a 120mm diameter hole to 1600mm depth at 1m/min, then rotates 120° to position the splitter for 8000T splitting force. The entire sequence is completed without repositioning the excavator.

Receive Detailed Parameter List

Site Conditions and Challenges for the Excavator Drill and Splitting Machine

The Bulgarian project involved excavating hard granite with compressive strength reaching 80MPa. The site presented several challenges:

  • Hard rock formation – granite with high compressive strength
  • Restricted area – proximity to an active roadway prohibited blasting
  • Environmental requirements – strict noise and vibration limits
  • Limited working space – narrow mountain terrain

Traditional blasting was not permitted. The contractor needed an integrated drill and splitting machine that could deliver precise, controlled rock breaking with minimal environmental impact.

excavator rock drill splitter working
excavator rock drill splitter working
on-site footage of hydraulic rock drill and splitter in operation
on-site footage of hydraulic rock drill and splitter in operation

Why Does YG Hydraulic Rock Drill and Splitter Suit Bulgarian Conditions?

The machine offers several advantages for Bulgarian rock excavation:

  1. No blasting required – The machine eliminates explosive permits and safety zones. This is critical for projects near roadways and populated areas.
  2. Single-machine operation – This machine performs both drilling and splitting, reducing equipment fleet requirements.
  3. Precision control – The integrated drill and splitting machine provides accurate hole placement and controlled splitting direction.
  4. Environmental compliance – Low noise and minimal dust meet Bulgarian environmental standards.
rock drill and splitter performance test
rock drill and splitter performance test
factory rock drill splitter quality check
factory rock drill splitter quality check

Get Professional Selection Advice

Maintenance and Support for the Excavator Drill and Splitting Machine

The integrated drill and splitting machine follows a structured maintenance schedule based on the warranty terms:

ComponentWarranty PeriodNotes
Whole machine1 year or 2000 hours (whichever comes first)Oil seals: replace at 300 hours of normal use
Hydraulic rock drill12 monthsHydraulic motor: 6 months or 1000 hours; wear parts not covered (shank, copper sleeve, seal, cup)
Splitter cylinder12 monthsNormal use
Air compressor6 monthsNormal use
Track/rail assembly6 monthsNormal use
Splitter wedge block3 monthsNormal use
Hydraulic components3 monthsNormal use (use genuine grease)
Hoses and pipes3 monthsNormal use
Dust collector filter3 monthsNormal use
Electrical parts1 monthNormal use (check input voltage)
Wear parts (no warranty)Copper sleeve, shank, drill rod, drill bit, splitting wedge, wedge block

Wear parts on the machine – including copper sleeve, shank, drill rod, drill bit, splitting wedge, and wedge block – are not covered under warranty and require regular inspection.

The Bulgarian contractor reports that routine maintenance of the machine takes approximately 2 hours per week, with major service intervals at 300 and 1000 operating hours.

integrated rock drill and splitter accessories
integrated rock drill and splitter accessories
hydraulic rock drill splitter production
hydraulic rock drill splitter production

Find The Right Solution For Your Job

Hydraulic Rock Drill and Splitter Delivers Results

The machine has proven effective for Bulgarian rock excavation. Key outcomes after 6 months:

  • Drilling speed – 1m/min through 80MPa granite
  • Splitting force – 8000T capacity handles large rock masses
  • Depth capacity – 1600mm drilling depth with 1000mm splitting depth
  • Operational efficiency – single machine replaces multiple equipment pieces

For Bulgarian contractors facing hard rock excavation without blasting options, YG’s integrated drill and splitting machine offers a proven solution.

If you’d like to choose one of these machines for your specific needs, please feel free to contact us. We have various models to choose from, and there’s bound to be one that suits your requirements.

Phone / WhatsApp / WeChat:+86 159 3715 3321

    Please feel free to give your inquiry in the form below. We will reply in 24 hours.

    Product Model:

    Your Name(required):

    Your Email(required):

    Your Phone(required):

    Your country:

    Your Whatsapp(required):

    Your Message(required):