Project Overview: YG Excavator Drill and Splitting Machine Deployed in Bulgaria
Bulgaria’s infrastructure sector is expanding rapidly, with major investments in road networks, tunnel construction, and mining operations across the country. A Bulgarian civil engineering contractor secured a rock excavation project in the Stara Planina mountain region, requiring efficient rock breaking without traditional blasting methods.
The contractor selected our integrated drill and splitting machine – a hydraulic rock drill and splitter mounted on a 25-ton excavator. This machine arrived on-site in Q1 2026 and has been operating continuously for over 6 months.
Technical Specifications of the Integrated Drill and Splitting Machine
The following parameters define the hydraulic rock drill and splitter delivered to the Bulgarian project:
| Rock Drilling Machine | |||
| Power | Drilling hole diameter | Drilling depth | Drilling speed |
| 24kw | Middle 120mm | 1600mm | 1m/min |
| Splitting Machine | |||
| Splitting depth | Splitting force | Rotation angle | – |
| 1000MM | 8000T | 120° | – |
| Push Beam | |||
| Rock drilling maximum propulsion | Splitting maximum pullout force | ||
| 25KN | 70KN | ||
| Excavator requirements:>20T | |||
This integrated drill and splitting machine combines drilling and splitting into a single attachment. The machine first drills a 120mm diameter hole to 1600mm depth at 1m/min, then rotates 120° to position the splitter for 8000T splitting force. The entire sequence is completed without repositioning the excavator.
Receive Detailed Parameter List
Site Conditions and Challenges for the Excavator Drill and Splitting Machine
The Bulgarian project involved excavating hard granite with compressive strength reaching 80MPa. The site presented several challenges:
- Hard rock formation – granite with high compressive strength
- Restricted area – proximity to an active roadway prohibited blasting
- Environmental requirements – strict noise and vibration limits
- Limited working space – narrow mountain terrain
Traditional blasting was not permitted. The contractor needed an integrated drill and splitting machine that could deliver precise, controlled rock breaking with minimal environmental impact.


Why Does YG Hydraulic Rock Drill and Splitter Suit Bulgarian Conditions?
The machine offers several advantages for Bulgarian rock excavation:
- No blasting required – The machine eliminates explosive permits and safety zones. This is critical for projects near roadways and populated areas.
- Single-machine operation – This machine performs both drilling and splitting, reducing equipment fleet requirements.
- Precision control – The integrated drill and splitting machine provides accurate hole placement and controlled splitting direction.
- Environmental compliance – Low noise and minimal dust meet Bulgarian environmental standards.


Get Professional Selection Advice
Maintenance and Support for the Excavator Drill and Splitting Machine
The integrated drill and splitting machine follows a structured maintenance schedule based on the warranty terms:
| Component | Warranty Period | Notes |
| Whole machine | 1 year or 2000 hours (whichever comes first) | Oil seals: replace at 300 hours of normal use |
| Hydraulic rock drill | 12 months | Hydraulic motor: 6 months or 1000 hours; wear parts not covered (shank, copper sleeve, seal, cup) |
| Splitter cylinder | 12 months | Normal use |
| Air compressor | 6 months | Normal use |
| Track/rail assembly | 6 months | Normal use |
| Splitter wedge block | 3 months | Normal use |
| Hydraulic components | 3 months | Normal use (use genuine grease) |
| Hoses and pipes | 3 months | Normal use |
| Dust collector filter | 3 months | Normal use |
| Electrical parts | 1 month | Normal use (check input voltage) |
| Wear parts (no warranty) | — | Copper sleeve, shank, drill rod, drill bit, splitting wedge, wedge block |
Wear parts on the machine – including copper sleeve, shank, drill rod, drill bit, splitting wedge, and wedge block – are not covered under warranty and require regular inspection.
The Bulgarian contractor reports that routine maintenance of the machine takes approximately 2 hours per week, with major service intervals at 300 and 1000 operating hours.


Find The Right Solution For Your Job
Hydraulic Rock Drill and Splitter Delivers Results
The machine has proven effective for Bulgarian rock excavation. Key outcomes after 6 months:
- Drilling speed – 1m/min through 80MPa granite
- Splitting force – 8000T capacity handles large rock masses
- Depth capacity – 1600mm drilling depth with 1000mm splitting depth
- Operational efficiency – single machine replaces multiple equipment pieces
For Bulgarian contractors facing hard rock excavation without blasting options, YG’s integrated drill and splitting machine offers a proven solution.
If you’d like to choose one of these machines for your specific needs, please feel free to contact us. We have various models to choose from, and there’s bound to be one that suits your requirements.