Many overseas quarry owners and construction contractors struggle to pick the right rock drill and splitter. The wrong model will cause low rock-breaking efficiency and expensive downtime. This buying guide covers all key selection factors, working condition matching, and so on.


Key Technical Specifications of Integrated Rock Drill and Splitter
| Rock Drilling Machine | |||
| Power | Drilling hole diameter | Drilling depth | Drilling speed |
| 24kw | Middle 120mm | 1600mm | 1m/min |
| Splitting Machine | |||
| Splitting depth | Splitting force | Rotation angle | – |
| 1000MM | 8000T | 120° | – |
| Push Beam | |||
| Rock drilling maximum propulsion | Splitting maximum pullout force | ||
| 25KN | 70KN | ||
| Excavator requirements:>20T | |||
Understand Your Job Site First
Before you pick any hydraulic rock drill and rock splitter, check your own site conditions first. This saves you from costly mistakes.
① Working environment – Is your site in a city area, mine, tunnel, or chemical plant? Are explosives banned? Is it near residential zones? The rock drill and splitter is a non-blasting solution that works silently with zero vibration.
② Rock / concrete hardness – Granite, limestone, or reinforced concrete? Hardness directly decides how much splitting force your machine needs.
③ Excavator matching tonnage – What excavator do you already own? This integrated rock drill and splitter mounts directly on your excavator. The wrong tonnage match will damage your machine.
④ Special local restrictions – High temperatures in the Middle East? Coastal salt corrosion in Southeast Asia? Strict noise regulations in Europe? Tell your supplier.


Get Professional Selection Advice
Core Technical Parameters You Must Compare for Hydraulic Rock Drill and Rock Splitter
Engineers and procurement managers read data first. Here is what each number means for your project.
| Parameter | What it means | How it affects your project |
| Splitting force: 8000T | Maximum splitting thrust | Hard rock needs higher force. 8000T handles most granite and hard limestone. |
| Drilling depth: 1600mm | Maximum hole depth | Decides single rock breaking size. Deeper holes = bigger pieces per split. |
| Drilling speed: 1m/min | Penetration rate | Faster drilling = higher daily output. |
| Drilling hole diameter: 120mm | Hole size | Matches splitter wedge size. Wrong diameter means poor splitting. |
| Excavator requirement: >20T | Matching excavator weight | Avoid overload damage to your digger. |
| Splitting depth: 1000mm | Effective split depth | Determines how deep the splitter can work inside the hole. |
| Rotation angle: 120° | Splitter positioning range | Works on different rock faces without repositioning the excavator. |
| Rock drilling propulsion: 25KN | Forward thrust for drilling | Keeps drill bit moving steadily through hard rock. |
| Splitting pullout force: 70KN | Force to pull splitter out | Prevents the splitter from getting stuck in the rock. |
Recommendation: For granite quarries, choose a hydraulic rock drill and rock splitter with a splitting force above 4000T. For urban foundation work, the 120° rotation angle gives you flexibility in tight spaces.


Get Your Project‑Specific Quote
Match Machine Model With Global Working Scenarios
Middle East Granite Quarry
Scene: Large-scale granite quarry in hot, arid conditions. Blasting is expensive and strictly regulated.
Pain point of old solution: Explosives require permits, specialized handlers, and create safety zones that reduce usable quarry area. Drill-only methods are too slow.
Recommended model & benefits: YG rock drill and splitter with 8000T splitting force and 1600mm drilling depth. No blasting permits needed. Higher stone recovery rate. Works in 50°C heat with proper high-temperature seals.
Southeast Asia Urban
Scene: City center excavation for high-rise building. Surrounded by offices, shops, and apartments.
Pain point of old solution: Jackhammers create unbearable noise. Vibration damages nearby structures. Local authorities fine contractors for noise complaints.
Recommended model & benefits: YG hydraulic rock drill and rock splitter operate with minimal noise and zero vibration. No flying debris. Work during daytime without disturbing neighbors. 120° rotation angle fits narrow basement spaces.
European Tunnel Renovation
Scene: Old railway tunnel being widened. Limited access, overhead clearance restrictions.
Pain point of old solution: Explosives are banned inside tunnels. Breaker hammers create dust and damage existing tunnel lining.
Recommended model & benefits: This integrated rock drill and splitter is compact enough for tunnel work. Drills 120mm holes at 1m/min speed, then splits cleanly. No over-break, no structural damage to existing tunnel.
African Hard Rock Mine
Scene: Open-pit mine with extremely hard ore body. High production targets.
Pain point of old solution: Drill-and-blast cycle is slow. Each blast requires evacuation, inspection, and mucking. Lost production time adds up.
Recommended model & benefits: The rock drill and splitter work continuously. Drill-split-clear cycle eliminates blasting delays. 8000T splitting force cracks the hardest ore.
Latin American Quarry – Coastal Area
Scene: Seaside quarry with salt spray and high humidity.
Pain point of old solution: Standard machines rust within months. Corrosion kills hydraulic systems.
Recommended model & benefits: Factory offers anti-corrosion treatment for coastal environments. Marine-grade paint and sealed hydraulic components extend machine life.
South Asian Riverbed / Canal Project
Scene: Removing boulders from riverbeds for canal deepening. Wet conditions, unstable ground.
Pain point of old solution: Excavator buckets can’t handle large boulders. Blasting near water is dangerous and often illegal.
Recommended model & benefits: The hydraulic rock drill and rock splitter work in wet conditions. Drill holes in submerged boulders, split them underwater, then remove pieces.


Find The Right Solution For Your Job
4 Common Buying Mistakes Integrated Rock Drill and Splitter Overseas Buyers Always Make
Mistake 1: Only focus on low price, ignore wear parts service life
Cheap hydraulic rock drill and splitter models use low-grade wear parts. Copper sleeves, shanks, drill rods, and drill bits wear out fast. In overseas markets, replacement labor is expensive and parts take weeks to arrive. Correct approach: Ask about wear part material and expected service hours before buying.
Mistake 2: Ignore local environment adaptation
Desert sites need high-temperature seals. Coastal sites need anti-corrosion treatment. Standard machines fail in 3–6 months in harsh environments. Correct approach: Tell your supplier your working country and site conditions. Request appropriate modifications.
Mistake 3: Mismatch excavator hydraulic flow
The hydraulic rock drill and rock splitter draw power from your excavator’s hydraulic system. Wrong flow rate damages the pump. Correct approach: Send your excavator model and hydraulic specs to the factory for verification.
Mistake 4: Neglecting after-sales and spare parts supply
No overseas parts warehouse = months of downtime when something breaks. Correct approach: Choose a supplier with overseas parts stock and remote video support.


Get Professional Selection Advice
YG Global After-Sales & Export Support Reference
Overseas buyers worry about support more than local buyers. Here is what we provide:
| Support Item | Details |
| Packaging | Standard export packaging, moisture-proof & rust-proof for sea transport |
| Remote support | English video technical support, 7 days/week, 12 hours/day |
| Spare parts | Overseas warehouse with fast delivery |
| On-site training | Optional overseas engineer on-site training for large projects |


YG Warranty Summary
| Component | Warranty Period | Notes |
| Whole machine | 1 year or 2000 hours (whichever comes first) | Oil seals: replace at 300 hours of normal use |
| Hydraulic rock drill | 12 months | Hydraulic motor: 6 months or 1000 hours; wear parts not covered (shank, copper sleeve, seal, cup) |
| Splitter cylinder | 12 months | Normal use |
| Air compressor | 6 months | Normal use |
| Track/rail assembly | 6 months | Normal use |
| Splitter wedge block | 3 months | Normal use |
| Hydraulic components | 3 months | Normal use (use genuine grease) |
| Hoses and pipes | 3 months | Normal use |
| Dust collector filter | 3 months | Normal use |
| Electrical parts | 1 month | Normal use (check input voltage) |
| Wear parts (no warranty) | — | Copper sleeve, shank, drill rod, drill bit, splitting wedge, wedge block |
Send Your Project Details to Our Engineer
Tell us: excavator tonnage, rock type, working country, and site conditions. Our engineer will recommend the most suitable rock drill and splitter model for you.
Phone / WhatsApp / WeChat: +86 159 3715 3321






